Muskie Discussion Forums

Forums | Calendars | Albums | Quotes | Language | Blogs Search | Statistics | User Listing
You are logged in as a guest. ( logon | register )

Random quote: "Don't worry, it's just light rain and will blow right over."
- (Added by: Beaver)

Moderators: Slamr

View previous thread :: View next thread
Jump to page : 1
Now viewing page 1 [30 messages per page]

More Muskie Fishing -> Basement Baits and Custom Lure Painting -> Production rate
 
Message Subject: Production rate
wvhillbillyjlm
Posted 7/25/2011 8:25 AM (#508770)
Subject: Production rate





Posts: 278


Location: WV
I know everyones process is different but I was wondering how many baits you make at a time and how long it takes you from start to finish?

Thanks.
sybe.m.
Posted 7/25/2011 9:05 AM (#508777 - in reply to #508770)
Subject: RE: Production rate




Posts: 117


Location: holland
I am a slow builder. Making 1 lure from start to finish takes about 4 hours. I am buiding about 5 hours a day. i did not count the drying time of the paint en envirotex. Ill make 1 lure at the time

Edited by sybe.m. 7/25/2011 9:07 AM
MEISTERICS
Posted 7/25/2011 11:34 AM (#508812 - in reply to #508777)
Subject: RE: Production rate




Posts: 77


Depends on the design. Probably 3 hours start to finish. Including setup and clean up. Batches seem to help nothing, and may possibly slow the process. At least big batches of 10 or more.
ghost1066
Posted 7/25/2011 10:21 PM (#508928 - in reply to #508770)
Subject: RE: Production rate




Posts: 73


Location: Tennessee
I make several blanks at one time but then paint them one at a time. I put them on a drying rack until I have enough to go on the spinner. I turned 4 this morning in about an hour then took another hour adding tail weights, sanding and priming. Painting can be fast (15 minutes or less) for a simple 4-5 color scheme or take an hour or more for the complex patterns.

woodieb8
Posted 7/26/2011 5:43 AM (#508949 - in reply to #508770)
Subject: Re: Production rate




Posts: 1529


production. from cutting lumber to size, lathe work. table saw, router. sandig . its a production list. we do upwards of 20 pieces daily. the end results from rough wood to boxed product is 3 days.. theres a list of requirments, then theres the list of dunnage. . cracked wood,nicks.
wooden lure making is truly a labour of love.
ghost1066
Posted 7/26/2011 6:40 AM (#508952 - in reply to #508949)
Subject: Re: Production rate




Posts: 73


Location: Tennessee
woodie you aren't kidding. If you don't love doing this you won't do it for long. All of the extras you mentioned, cracked pieces, nicks, the paint runs or etex drips all need to be fixed and add time to the process.
RiverMan
Posted 7/26/2011 8:09 PM (#509113 - in reply to #508770)
Subject: Re: Production rate




Posts: 1504


Location: Oregon
Hard to figure in "production time" when there is so many variables. How do you account for time to drive to buy the lumber, order screws, order clearcoat, buy paints, maintenance saws, routers, sanders, clean-up sawdust, test lures, advertise lures, package lures, accept payment, maintain website, the list goes on and on. Calculating straight production is about half or less of the time needed to produce from my experience. Lure building is definitely a labor of love but I don't plan on quitting anytime soon.

Jed

Edited by RiverMan 7/26/2011 8:11 PM
zach2626
Posted 7/29/2011 2:51 PM (#509594 - in reply to #508770)
Subject: RE: Production rate




Posts: 184


I used to only make a few at a time but lately it has been in batches of 50 baits and around 100 a month. Just makes sense to me to do all the same job at a time so I work in batches. As for how long to make a single bait, including everything- around 4 days. Best luck Mr Myers.

Edited by zach2626 7/29/2011 3:01 PM
MuskyFix
Posted 7/29/2011 4:32 PM (#509608 - in reply to #509594)
Subject: RE: Production rate





3 Baits for cutting and shaping = 1 Hour
3 baits Weight and filler, epoxy sealer = .5 Hour
3 baits paint 1 hour
3 baits fins and gills = .5 Hour
3 baits epoxy 4 coats of etex = 2.5 hours
Assemble = .5 hour

= 6 hours per 3 baits - 6 divided by 3

= 2 hours per lure... IMO


Edited by MuskyFix 7/29/2011 4:34 PM
Jump to page : 1
Now viewing page 1 [30 messages per page]
Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete all cookies set by this site)