
Posts: 317
Location: Grafton, WI | Setme31,
The gas tank is in the far back of the boat behind the casting deck. I installed a 13 built in tank. You can see the filler and vent in the picture.
The flush livewell was done by creating the same thing as the side that has the rod locker. If your boat is the same, you have a 3/4" drop on the side with the rod locker. I added 3/4" plywood to the livewell side where it also drops down at the front deck. Once I knew where the lid was going to go, I cut the plywood so the lid would fit... then glued and screwed it down, and fiberglassed it.
The rod locker was done basically the same, only with that I cut a new hole where the lid would go, added new 3/4 plywood to the area that was not needed, and mounted the supports to the bottom side. I was able to fabricate a drain lip around the rod box from the old lip around it. In the picture, it is supposed to show a cutout of the way the plywood was mounted as a support. - everything was fiberglassed prior to carpet.
Hope I didn't confuse you too much.
If you want more pictures, or chat - shoot me an e-mail - [email protected]
Attachments ----------------
livewell_1.jpg (73KB - 483 downloads)
livewell_2.jpg (61KB - 499 downloads)
rod_locker.jpg (77KB - 369 downloads)
rear_1.jpg (81KB - 576 downloads)
|